CASE STUDIES: SOIL NAILING
Click here to email us

PREVIOUS PAGE


Product : SOIL NAILING
Client : M6 Toll
Contractor : Cambba Construction Ltd
Project : Structure B150. Midland Expressway
Wall Height : 7.2 metres

Installed temporary soil nails to an embankment to enable the Main Contractor to create the new toll roll. The live railways bridge above the works required a very high specification for the consruction and regular monitoring.