FRF Motors, one of Swansea’s largest car dealerships wanted to extend their car lot but the land available was 7·5 meters lower than their existing garage.
Camarthenshire Council faced with the challenge of building a new highway across the main London to Fishguard rail line has solved the problem with a novel solution.
Phi Group acted as main contractor to carry out the setting out, bulk excavation and cart away to enable Phi's own Ground Engineering team to construct the soil nailed, Soil Panel SN structure.
Designed and installed modular block system to form access for the racehorses from the stable to the parade ring. An extremely high specification of finish was required and achieved to protect the horses.
Designed and installed modular block system to form access from a car park to a retail development. The Titan wall system used to facilitate numerous ramps, staircases, parapet walls and planting bags.