Invite Friends

Thank you for your interest in spreading the word on Phigroup.

NOTE: We only request your email address so that the person you are recommending the page to knows that you wanted them to see it, and that it is not junk mail. We do not capture any email address.

Enter multiple addresses on separate lines or separate them with commas.

Stoney Close, Leicester

Product:
Geolock
Client:
Hydrotechnics
Contractor:
Hydrotechnics
Project:
Stoney Close, Leicester
Wall Height:
4 metres

GeolockSplit face minor blocks were used in conjunction with ground anchors to create space for new access roads to a Diving Training Centre near Leicester. Excavation of the clay banks was minimised by installing ground anchors to stabilise the steeply cut face, and then building the 4m high Geolock wall in front, with positive connections to the anchor strands. The gap between the back of the wall and the excavated face was filled with a free draining material, and a collector drain was placed behind the wall at the base.