Invite Friends
Structure B150, Midland Expressway
- Product:
- Soil Nailing
- Client:
- M6 Toll
- Contractor:
- Cambba Construction Ltd
- Project:
- Structure B150. Midland Expressway
- Wall Height:
- 7.2 metres
Installed temporary soil nails to an embankment to enable the Main Contractor to create the new toll roll. The live railways bridge above the works required a very high specification for the consruction and regular monitoring.






Bookmark with: